Easy PV
Midsummer
Design & simulation · Web
Comparison
14 differences · 19 identical
The differences that matter most
They differ most on pricing model. Arka 360 publishes USD 159; Reslink Energy publishes USD 2000. They use different pricing models, so those figures do not compare directly.
We do not name a winner. Below are 14 differences drawn from the same sourced dataset that powers both product pages.
Verified against the vendor’s own pages.
These cannot be compared on a single number
Arka 360 is priced per-seat and Reslink Energy is priced capacity-tiered. These are different pricing models, so a single side-by-side figure would be misleading. Each is shown as its vendor states it.
Arka 360
USD 159
159 USD per month (one of three conflicting figures)
Per seat
1 seat included
Reslink Energy
USD 2000
2000 USD per year
Capacity tiered
Size ceiling: 100 kW / 500 kW / 5 MW / 100 MW
Prices are shown exactly as each vendor writes them and are never converted between currencies.
14 differences, ordered by how much they are likely to matter — pricing transparency first, then capabilities the vendor explicitly confirms or denies.
| Capability | Arka 360 | Reslink Energy |
|---|---|---|
| Solar design & simulation | ||
| Annual energy yield simulation | Advanced Verified | Basic Vendor claim |
| CAD export (DXF/DWG) | Yes Verified | Yes Vendor claim |
| Ground-mount / tracker layout | Basic Vendor claim | Advanced Verified |
| Estimation & financial modelling | ||
| ROI / payback calculation | Advanced Verified | Basic Vendor claim |
| AI & automation | ||
| AI design assistance | vendor-claimed Verified | — Could not read |
| Integrations & extensibility | ||
| Named, documented integrations | 2 Verified | 0 Verified |
| Platform & deployment | ||
| Delivery model | hybrid Verified | software Verified |
| Pricing & commercial terms | ||
| Pricing model | per-seat Verified | capacity-tiered Verified |
| Free tier | Not offered Verified | demo-only Verified |
| Entry price | 159 USD per month (one of three conflicting figures) Verified | 2000 USD per year Verified |
| Seat cap | 1 Verified | — Could not read |
| System size cap | — Could not read | 100 kW / 500 kW / 5 MW / 100 MW Verified |
| Market fit & availability | ||
| Geographic availability | US; IN; global Verified | IN; global Verified |
| Target buyer | solo-installer; small-installer Verified | small-installer; enterprise-epc Verified |
Scroll the table sideways to see both products. The capability column stays in place.
Framed as requirements, not a verdict. Both descriptions come from the same data.
Residential and small-commercial installers who want design, shading, proposal and a light CRM in one subscription, and who are willing to buy permit plan sets from the same vendor. It is not for anyone who needs a dependable list price: the `/pricing` URL alone serves four incompatible price schedules in two currencies in a single page, and `/pricing-in` serves two different rupee schedules simultaneously. It is also not a utility-scale tool — there is no tracker or terrain workflow beyond a "single axis tracker" row in a feature table. [✓ https://arka360.com/pricing · 2026-09-25]
Full Arka 360 profileIndian rooftop and C&I EPCs whose sales reps carry a phone rather than a laptop and who want the design, BOM and proposal produced on the roof. It is not for anyone who needs a price they can rely on before they call sales: the same site publishes four mutually incompatible price schedules, in two currencies, on two billing periods, with two different sets of plan names — and a fifth figure appears on its Capterra listing. [✓ https://www.reslink.org/pricing/ · 2026-09-25]
Full Reslink Energy profileMidsummer
Design & simulation · Web
SolarEdge Technologies
Design & simulation · Web
National Laboratory of the Rockies (NLR) — formerly the National Renewable Energy Laboratory (NREL)
Design & simulation · Desktop
They differ most on pricing model. In total we recorded 14 verified differences and 19 points where they are the same.
Arka 360 is priced per-seat and Reslink Energy is priced capacity-tiered. These are different pricing models, so a single side-by-side figure would be misleading. Each is shown as its vendor states it.
We do not name a winner. Both are described from the same verified data, and which suits you depends on your requirements — the differences above are the facts; the choice is yours.
Last verified
Vendors change pricing and features without notice. Check the vendor’s own page before deciding.
This comparison is generated from the feature database, not written by hand. A pair is only published when the data holds at least five stateable differences — which is why 281 candidate pairs were refused. How comparisons are built