SolarSoftwares
Find Software →

100 products researched 2,422 sourced facts Verified September 2026 Methodology

Reslink Energy

by Reslink Technologies Private Limited · New Delhi, India (head office); registered office Loni, Ghaziabad, Uttar Pradesh

Design & simulation · Software

Entry price
USD 2000
Charged
Capacity tiered
Try before buying
Demo only
Runs on
Web
Built for
Residential · C&I · ground-mount
Named integrations
0
Last verified

against the vendor’s own pages

What is Reslink Energy?

A mobile-first 3D solar design and proposal platform for Indian EPCs that claims to take a rooftop from satellite imagery to a bill of materials and a signed-ready proposal without a site visit.

It publishes 2000 USD per year. We recorded 24 verified capabilities and 5 the vendor claims but we could not confirm.

Verified against the vendor’s own pages.

The two questions vendors rarely answer

Free or paid?

Demo only — no trial

The vendor states it offers demos rather than trials.

Dependencies & lock-in

None recorded

We did not establish a hard third-party dependency. That is not the same as confirming there is none.

Our editorial assessment — not a user review

Who it is for — and who it is not for

Indian rooftop and C&I EPCs whose sales reps carry a phone rather than a laptop and who want the design, BOM and proposal produced on the roof. It is not for anyone who needs a price they can rely on before they call sales: the same site publishes four mutually incompatible price schedules, in two currencies, on two billing periods, with two different sets of plan names — and a fifth figure appears on its Capterra listing. [✓ https://www.reslink.org/pricing/ · 2026-09-25]

Editorial assessment from the research recordSourcereslink.orgVerified

Pricing

2000 USD per year

Published Capacity tiered
  • System size: 100 kW / 500 kW / 5 MW / 100 MW

Demo only, no trial

Sourcereslink.orgVerifiedfirst-hand

Prices are shown exactly as the vendor writes them and are never converted between currencies — a converted figure would be a number we invented. How we verify pricing

Feature detail

31 normalised data points across 7 capability areas. Every row carries its evidence state; hover any chip for what that state means.

Legend Verified Vendor claim Not offered Not found Could not read
Solar design & simulation 8 verified 3 claimed 2 not found
Solar design & simulation capabilities for Reslink Energy
Capability Value Evidence
Array design
Automatic module layout ⓘ Advanced Verified
Ground-mount / tracker layout ⓘ Advanced Verified
Electrical design
Single-line diagram ⓘ Advanced Verified
String sizing / stringing ⓘ Advanced Verified
Interoperability
CAD export (DXF/DWG) ⓘ — Vendor claim
Site capture
3D roof and obstruction model ⓘ Advanced Verified
On-site capture (drone / photogrammetry) ⓘ — Not found
Remote site capture from imagery ⓘ Advanced Verified
Storage design
Battery sizing and modelling ⓘ Advanced Verified
Yield simulation
Annual energy yield simulation ⓘ Basic Vendor claim
Bankable / IE-accepted simulation report ⓘ Basic Vendor claim
Loss and uncertainty modelling (P50/P90) ⓘ Advanced Verified
Named weather / irradiance data source ⓘ — Not found
Proposals & sales 1 verified
Proposals & sales capabilities for Reslink Energy
Capability Value Evidence
Proposal generation
Proposal document generation ⓘ Advanced Verified
Estimation & financial modelling 1 claimed
Estimation & financial modelling capabilities for Reslink Energy
Capability Value Evidence
Financial modelling
ROI / payback calculation ⓘ Basic Vendor claim
Integrations & extensibility 1 verified 1 claimed
Integrations & extensibility capabilities for Reslink Energy
Capability Value Evidence
Extensibility
Public API ⓘ Basic Vendor claim
Named integrations
Named, documented integrations ⓘ 0 Verified
Platform & deployment 2 verified
Platform & deployment capabilities for Reslink Energy
Capability Value Evidence
Deployment
Delivery model software Verified
Web application — Verified
Pricing & commercial terms 6 verified
Pricing & commercial terms capabilities for Reslink Energy
Capability Value Evidence
Limits
System size cap 100 kW / 500 kW / 5 MW / 100 MW Verified
Pricing transparency
Currency USD Verified
Entry price ⓘ 2000 USD per year Verified
Price published ⓘ Published Verified
Pricing model capacity-tiered Verified
Trial
Free tier demo-only Verified
Market fit & availability 6 verified
Market fit & availability capabilities for Reslink Energy
Capability Value Evidence
Availability
Geographic availability IN; global Verified
Buyer
Target buyer ⓘ small-installer; enterprise-epc Verified
Lifecycle
Product status active Verified
Segment
C&I ⓘ — Verified
Residential ⓘ — Verified
Utility-scale ⓘ No Verified

AI capabilities

No AI claim on the vendor’s own pages

We found no explicit AI or machine-learning claim. Words like “smart”, “one-click automatic” and “magic” are automation claims and are deliberately not counted as AI — coding them as AI would fabricate a capability the vendor never asserted.

Integrations

No integration named on the vendor’s own site

We searched and found no named third-party product. Integration information has not been verified for Reslink Energy.

Collected from users — none yet

Verified user reviews

No verified user reviews yet

We publish only reviews we collect and verify ourselves. No review of Reslink Energy has cleared identity verification and moderation yet, so there is no score — and there will be none until eight verified reviews exist.

Third-party ratings from G2, Capterra and TrustRadius are never mixed into our score or our structured data; where we cite them they are attributed and dated. How our review system works · Write a review

Third-party review presence recorded during research: Capterra, G2, TrustRadius. Cited in prose only, never in our markup.

Compare Reslink Energy

Only pairs where the database holds a real, stateable difference are published. Every one of these was generated from the same feature data shown above.

Reslink Energy alternatives

All alternatives

Products in Design & simulation, free and lower-cost options first.

Explore what Reslink Energy does

Each link shows every product we researched with that capability or selling to that buyer, so you can see who else is in the running.

Frequently asked

How much does Reslink Energy cost?

Reslink Energy publishes 2000 USD per year, charged capacity tiered. Read on the vendor's own pricing page on 28 September 2026.

Is Reslink Energy free?

Demo only, no trial.

What does Reslink Energy integrate with?

No third-party integration is named on Reslink Energy's own site. A logo wall is not an integration list.

Sources and verification

Data coverage

24 verified · 5 vendor-claimed · 2 not found

77% of the 31 applicable data points were confirmed on Reslink Technologies Private Limited’s own pages.

Last verified

Vendors change pricing and features without notice. Check the vendor’s own page before deciding.