Reslink Energy
by Reslink Technologies Private Limited · New Delhi, India (head office); registered office Loni, Ghaziabad, Uttar Pradesh
Design & simulation · Software
- Entry price
- USD 2000
- Charged
- Capacity tiered
- Try before buying
- Demo only
- Runs on
- Web
- Built for
- Residential · C&I · ground-mount
- Named integrations
- 0
- Last verified
against the vendor’s own pages
What is Reslink Energy?
A mobile-first 3D solar design and proposal platform for Indian EPCs that claims to take a rooftop from satellite imagery to a bill of materials and a signed-ready proposal without a site visit.
It publishes 2000 USD per year. We recorded 24 verified capabilities and 5 the vendor claims but we could not confirm.
Verified against the vendor’s own pages.
The two questions vendors rarely answer
Free or paid?
Demo only — no trial
The vendor states it offers demos rather than trials.
Dependencies & lock-in
None recorded
We did not establish a hard third-party dependency. That is not the same as confirming there is none.
Our editorial assessment — not a user review
Who it is for — and who it is not for
Indian rooftop and C&I EPCs whose sales reps carry a phone rather than a laptop and who want the design, BOM and proposal produced on the roof. It is not for anyone who needs a price they can rely on before they call sales: the same site publishes four mutually incompatible price schedules, in two currencies, on two billing periods, with two different sets of plan names — and a fifth figure appears on its Capterra listing. [✓ https://www.reslink.org/pricing/ · 2026-09-25]
Editorial assessment from the research recordSourcereslink.orgVerified
Pricing
2000 USD per year
- System size: 100 kW / 500 kW / 5 MW / 100 MW
Demo only, no trial
Sourcereslink.orgVerifiedfirst-hand
Prices are shown exactly as the vendor writes them and are never converted between currencies — a converted figure would be a number we invented. How we verify pricing
Feature detail
31 normalised data points across 7 capability areas. Every row carries its evidence state; hover any chip for what that state means.
Solar design & simulation 8 verified 3 claimed 2 not found
| Capability | Value | Evidence |
|---|---|---|
| Array design | ||
| Automatic module layout ⓘ | Advanced | Verified |
| Ground-mount / tracker layout ⓘ | Advanced | Verified |
| Electrical design | ||
| Single-line diagram ⓘ | Advanced | Verified |
| String sizing / stringing ⓘ | Advanced | Verified |
| Interoperability | ||
| CAD export (DXF/DWG) ⓘ | — | Vendor claim |
| Site capture | ||
| 3D roof and obstruction model ⓘ | Advanced | Verified |
| On-site capture (drone / photogrammetry) ⓘ | — | Not found |
| Remote site capture from imagery ⓘ | Advanced | Verified |
| Storage design | ||
| Battery sizing and modelling ⓘ | Advanced | Verified |
| Yield simulation | ||
| Annual energy yield simulation ⓘ | Basic | Vendor claim |
| Bankable / IE-accepted simulation report ⓘ | Basic | Vendor claim |
| Loss and uncertainty modelling (P50/P90) ⓘ | Advanced | Verified |
| Named weather / irradiance data source ⓘ | — | Not found |
Proposals & sales 1 verified
| Capability | Value | Evidence |
|---|---|---|
| Proposal generation | ||
| Proposal document generation ⓘ | Advanced | Verified |
Estimation & financial modelling 1 claimed
| Capability | Value | Evidence |
|---|---|---|
| Financial modelling | ||
| ROI / payback calculation ⓘ | Basic | Vendor claim |
Integrations & extensibility 1 verified 1 claimed
| Capability | Value | Evidence |
|---|---|---|
| Extensibility | ||
| Public API ⓘ | Basic | Vendor claim |
| Named integrations | ||
| Named, documented integrations ⓘ | 0 | Verified |
Platform & deployment 2 verified
| Capability | Value | Evidence |
|---|---|---|
| Deployment | ||
| Delivery model | software | Verified |
| Web application | — | Verified |
Pricing & commercial terms 6 verified
| Capability | Value | Evidence |
|---|---|---|
| Limits | ||
| System size cap | 100 kW / 500 kW / 5 MW / 100 MW | Verified |
| Pricing transparency | ||
| Currency | USD | Verified |
| Entry price ⓘ | 2000 USD per year | Verified |
| Price published ⓘ | Published | Verified |
| Pricing model | capacity-tiered | Verified |
| Trial | ||
| Free tier | demo-only | Verified |
Market fit & availability 6 verified
| Capability | Value | Evidence |
|---|---|---|
| Availability | ||
| Geographic availability | IN; global | Verified |
| Buyer | ||
| Target buyer ⓘ | small-installer; enterprise-epc | Verified |
| Lifecycle | ||
| Product status | active | Verified |
| Segment | ||
| C&I ⓘ | — | Verified |
| Residential ⓘ | — | Verified |
| Utility-scale ⓘ | No | Verified |
AI capabilities
No AI claim on the vendor’s own pages
We found no explicit AI or machine-learning claim. Words like “smart”, “one-click automatic” and “magic” are automation claims and are deliberately not counted as AI — coding them as AI would fabricate a capability the vendor never asserted.
Integrations
No integration named on the vendor’s own site
We searched and found no named third-party product. Integration information has not been verified for Reslink Energy.
Collected from users — none yet
Verified user reviews
No verified user reviews yet
We publish only reviews we collect and verify ourselves. No review of Reslink Energy has cleared identity verification and moderation yet, so there is no score — and there will be none until eight verified reviews exist.
Third-party ratings from G2, Capterra and TrustRadius are never mixed into our score or our structured data; where we cite them they are attributed and dated. How our review system works · Write a review
Third-party review presence recorded during research: Capterra, G2, TrustRadius. Cited in prose only, never in our markup.
Compare Reslink Energy
Only pairs where the database holds a real, stateable difference are published. Every one of these was generated from the same feature data shown above.
Reslink Energy alternatives
All alternativesProducts in Design & simulation, free and lower-cost options first.
Easy PV
Midsummer
Design & simulation · Web
SolarEdge Designer
SolarEdge Technologies
Design & simulation · Web
SAM (System Advisor Model)
National Laboratory of the Rockies (NLR) — formerly the National Renewable Energy Laboratory (NREL)
Design & simulation · Desktop
Explore what Reslink Energy does
Each link shows every product we researched with that capability or selling to that buyer, so you can see who else is in the running.
Capabilities it carries
Who Reslink Technologies Private Limited sells it to
Frequently asked
How much does Reslink Energy cost?
Reslink Energy publishes 2000 USD per year, charged capacity tiered. Read on the vendor's own pricing page on 28 September 2026.
Is Reslink Energy free?
Demo only, no trial.
What does Reslink Energy integrate with?
No third-party integration is named on Reslink Energy's own site. A logo wall is not an integration list.
Sources and verification
Data coverage
24 verified · 5 vendor-claimed · 2 not found
77% of the 31 applicable data points were confirmed on Reslink Technologies Private Limited’s own pages.
Last verified
Vendors change pricing and features without notice. Check the vendor’s own page before deciding.