Easy PV
Midsummer
Design & simulation · Web
Comparison
21 differences · 13 identical
The differences that matter most
They differ most on pricing model. Reslink Energy publishes USD 2000; SolarEdge Designer publishes Free. They use different pricing models, so those figures do not compare directly.
We do not name a winner. Below are 21 differences drawn from the same sourced dataset that powers both product pages.
Verified against the vendor’s own pages.
These cannot be compared on a single number
Reslink Energy is priced capacity-tiered and SolarEdge Designer is priced free. These are different pricing models, so a single side-by-side figure would be misleading. Each is shown as its vendor states it.
Reslink Energy
USD 2000
2000 USD per year
Capacity tiered
Size ceiling: 100 kW / 500 kW / 5 MW / 100 MW
SolarEdge Designer
Free
0 USD no licence or subscription fees
Free
Prices are shown exactly as each vendor writes them and are never converted between currencies.
21 differences, ordered by how much they are likely to matter — pricing transparency first, then capabilities the vendor explicitly confirms or denies.
| Capability | Reslink Energy | SolarEdge Designer |
|---|---|---|
| Solar design & simulation | ||
| Ground-mount / tracker layout | Advanced Verified | — Not found |
| Loss and uncertainty modelling (P50/P90) | Advanced Verified | — Not found |
| Single-line diagram | Advanced Verified | — Not found |
| 3D roof and obstruction model | Advanced Verified | — Could not read |
| Annual energy yield simulation | Basic Vendor claim | Advanced Verified |
| Bankable / IE-accepted simulation report | Basic Vendor claim | — Not found |
| CAD export (DXF/DWG) | Yes Vendor claim | Yes Verified |
| Inverter sizing | — Could not read | Advanced Verified |
| On-site capture (drone / photogrammetry) | — Not found | — Could not read |
| Shading analysis | — Could not read | Advanced Verified |
| String sizing / stringing | Advanced Verified | — Could not read |
| Estimation & financial modelling | ||
| ROI / payback calculation | Basic Vendor claim | Advanced Verified |
| AI & automation | ||
| AI design assistance | — Could not read | vendor-claimed Verified |
| Integrations & extensibility | ||
| Named, documented integrations | 0 Verified | 2 Verified |
| Public API | Basic Vendor claim | — Not found |
| Pricing & commercial terms | ||
| Pricing model | capacity-tiered Verified | free Verified |
| Free tier | demo-only Verified | free-forever Verified |
| Entry price | 2000 USD per year Verified | 0 USD no licence or subscription fees Verified |
| System size cap | 100 kW / 500 kW / 5 MW / 100 MW Verified | — Could not read |
| Market fit & availability | ||
| Geographic availability | IN; global Verified | global Verified |
| Target buyer | small-installer; enterprise-epc Verified | — Could not read |
Scroll the table sideways to see both products. The capability column stays in place.
Framed as requirements, not a verdict. Both descriptions come from the same data.
Indian rooftop and C&I EPCs whose sales reps carry a phone rather than a laptop and who want the design, BOM and proposal produced on the roof. It is not for anyone who needs a price they can rely on before they call sales: the same site publishes four mutually incompatible price schedules, in two currencies, on two billing periods, with two different sets of plan names — and a fifth figure appears on its Capterra listing. [✓ https://www.reslink.org/pricing/ · 2026-09-25]
Full Reslink Energy profileFor installers designing SolarEdge systems who want design, compliance checking and a proposal at no cost, integrated with the SolarEdge Monitoring Platform. Not for vendor-neutral design work: the vendor's own copy scopes it to "all your SolarEdge systems" and to compliance with "the latest SolarEdge design rules". Any comparison page must state that the price is zero because the product sells inverters, not software.
Full SolarEdge Designer profileMidsummer
Design & simulation · Web
SolarEdge Technologies
Design & simulation · Web
National Laboratory of the Rockies (NLR) — formerly the National Renewable Energy Laboratory (NREL)
Design & simulation · Desktop
They differ most on pricing model. In total we recorded 21 verified differences and 13 points where they are the same.
Reslink Energy is priced capacity-tiered and SolarEdge Designer is priced free. These are different pricing models, so a single side-by-side figure would be misleading. Each is shown as its vendor states it.
We do not name a winner. Both are described from the same verified data, and which suits you depends on your requirements — the differences above are the facts; the choice is yours.
Last verified
Vendors change pricing and features without notice. Check the vendor’s own page before deciding.
This comparison is generated from the feature database, not written by hand. A pair is only published when the data holds at least five stateable differences — which is why 281 candidate pairs were refused. How comparisons are built