SolarSoftwares
Find Software →

100 products researched 2,422 sourced facts Verified September 2026 Methodology

Comparison

Easy PV vs Reslink Energy

21 differences · 15 identical

Easy PVMidsummer
Entry price
GBP 0
Charged
Per seat
Free tier or trial
Free tier, no time limit
Named integrations
3
Verified data points
10
Reslink EnergyReslink Technologies Private Limited
Entry price
USD 2000
Charged
Capacity tiered
Free tier or trial
Demo only, no trial
Named integrations
0
Verified data points
9

The differences that matter most

  • Pricing model per-seat capacity-tiered
  • Free tier free-forever demo-only
  • Entry price 0 GBP free tier; Pro GBP 35/month 2000 USD per year

All 21 differences ↓

Easy PV or Reslink Energy?

They differ most on pricing model. Easy PV publishes GBP 0; Reslink Energy publishes USD 2000. They use different pricing models, so those figures do not compare directly.

We do not name a winner. Below are 21 differences drawn from the same sourced dataset that powers both product pages.

Verified against the vendor’s own pages.

Pricing

These cannot be compared on a single number

Easy PV is priced per-seat and Reslink Energy is priced capacity-tiered. These are different pricing models, so a single side-by-side figure would be misleading. Each is shown as its vendor states it.

Easy PV

GBP 0

0 GBP free tier; Pro GBP 35/month

Per seat

20 seats included

Reslink Energy

USD 2000

2000 USD per year

Capacity tiered

Size ceiling: 100 kW / 500 kW / 5 MW / 100 MW

Prices are shown exactly as each vendor writes them and are never converted between currencies.

Where they differ

21 differences, ordered by how much they are likely to matter — pricing transparency first, then capabilities the vendor explicitly confirms or denies.

Legend Verified Vendor claim Not offered Not found Could not read
Differences between Easy PV and Reslink Energy
Capability Easy PV Reslink Energy
Solar design & simulation
Ground-mount / tracker layout — Not found Advanced Verified
Annual energy yield simulation Advanced Verified Basic Vendor claim
Bankable / IE-accepted simulation report — Not found Basic Vendor claim
Battery sizing and modelling Basic Verified Advanced Verified
CAD export (DXF/DWG) — Not found Yes Vendor claim
Remote site capture from imagery Basic Vendor claim Advanced Verified
Permitting & engineering
Interconnection application Advanced Verified — Could not read
Structural analysis Advanced Verified — Could not read
Estimation & financial modelling
ROI / payback calculation Advanced Verified Basic Vendor claim
AI & automation
AI design assistance not-claimed Not found — Could not read
Integrations & extensibility
Named, documented integrations 3 Verified 0 Verified
Platform & deployment
Delivery model hybrid Verified software Verified
Pricing & commercial terms
Pricing model per-seat Verified capacity-tiered Verified
Free tier free-forever Verified demo-only Verified
Entry price 0 GBP free tier; Pro GBP 35/month Verified 2000 USD per year Verified
Currency GBP Verified USD Verified
Seat cap 20 Verified — Could not read
System size cap — Could not read 100 kW / 500 kW / 5 MW / 100 MW Verified
Market fit & availability
Geographic availability UK Verified IN; global Verified
Jurisdictional compliance capability uk-mcs Verified — Could not read
Target buyer small-installer Verified small-installer; enterprise-epc Verified

Scroll the table sideways to see both products. The capability column stays in place.

Where they are the same 15 data points
  • Price published
  • Automatic module layout
  • Single-line diagram
  • String sizing / stringing
  • 3D roof and obstruction model
  • On-site capture (drone / photogrammetry)
  • Loss and uncertainty modelling (P50/P90)
  • Named weather / irradiance data source
  • Public API
  • Product status
  • C&I
  • Residential
  • Utility-scale
  • Web application
  • Proposal document generation

Which might suit you

Framed as requirements, not a verdict. Both descriptions come from the same data.

Consider Easy PV if…

  • you need a price you can plan against before talking to sales
  • you want to start without a budget approval
  • your work is mostly residential

UK residential and light-commercial installers who already buy from Midsummer, need MCS-compliant self-consumption modelling and structural/wind-loading numbers, and want DNO paperwork handled in the same place as the design. It is not for anyone outside the UK — MCS, DNO and the Midsummer trade account are the whole point — and the free tier's commercial logic should be read plainly: the software is free because the distributor is selling the hardware. [✓ https://easy-pv.co.uk/ · 2026-09-25]

Full Easy PV profile

Consider Reslink Energy if…

  • you need a price you can plan against before talking to sales
  • your systems fit within 100 kW / 500 kW / 5 MW / 100 MW
  • your work is mostly residential

Indian rooftop and C&I EPCs whose sales reps carry a phone rather than a laptop and who want the design, BOM and proposal produced on the roof. It is not for anyone who needs a price they can rely on before they call sales: the same site publishes four mutually incompatible price schedules, in two currencies, on two billing periods, with two different sets of plan names — and a fifth figure appears on its Capterra listing. [✓ https://www.reslink.org/pricing/ · 2026-09-25]

Full Reslink Energy profile

Related comparisons

Other options in design & simulation

Frequently asked

What is the main difference between Easy PV and Reslink Energy?

They differ most on pricing model. In total we recorded 21 verified differences and 15 points where they are the same.

Which costs more, Easy PV or Reslink Energy?

Easy PV is priced per-seat and Reslink Energy is priced capacity-tiered. These are different pricing models, so a single side-by-side figure would be misleading. Each is shown as its vendor states it.

Is Easy PV or Reslink Energy better?

We do not name a winner. Both are described from the same verified data, and which suits you depends on your requirements — the differences above are the facts; the choice is yours.

Last verified

Vendors change pricing and features without notice. Check the vendor’s own page before deciding.

This comparison is generated from the feature database, not written by hand. A pair is only published when the data holds at least five stateable differences — which is why 281 candidate pairs were refused. How comparisons are built