Easy PV
Midsummer
Design & simulation · Web
Comparison
27 differences · 8 identical
The differences that matter most
They differ most on price published. Aurora Solar publishes USD 159; HELIOS 3D publishes Not publicly disclosed. They use different pricing models, so those figures do not compare directly.
We do not name a winner. Below are 27 differences drawn from the same sourced dataset that powers both product pages.
Verified against the vendor’s own pages.
These cannot be compared on a single number
Aurora Solar is priced per-seat and HELIOS 3D is priced quote-only. These are different pricing models, so a single side-by-side figure would be misleading. Each is shown as its vendor states it.
Aurora Solar
USD 159
159 USD per user/month
Per seat
1 seat included
50 projects
HELIOS 3D
Not publicly disclosed
Quote only
Prices are shown exactly as each vendor writes them and are never converted between currencies.
27 differences, ordered by how much they are likely to matter — pricing transparency first, then capabilities the vendor explicitly confirms or denies.
| Capability | Aurora Solar | HELIOS 3D |
|---|---|---|
| Solar design & simulation | ||
| Battery sizing and modelling | Advanced Verified | — Not found |
| CAD export (DXF/DWG) | — Not found | Yes Verified |
| Named weather / irradiance data source | — Not found | advanced Verified |
| Single-line diagram | — Not found | Advanced Verified |
| Annual energy yield simulation | Advanced Verified | Basic Vendor claim |
| Bankable / IE-accepted simulation report | Basic Vendor claim | — Not found |
| Ground-mount / tracker layout | — Not applicable | Advanced Verified |
| Proposals & sales | ||
| E-signature | — Could not read | — Not found |
| Proposal document generation | Advanced Verified | — Could not read |
| Estimation & financial modelling | ||
| ROI / payback calculation | Advanced Verified | — Not found |
| Reporting, data & BI | ||
| Report / deliverable export | — Could not read | Advanced Verified |
| AI & automation | ||
| AI design assistance | vendor-claimed Verified | — Could not read |
| Integrations & extensibility | ||
| Public API | Advanced Verified | — Not found |
| Named, documented integrations | 7 Verified | 1 Verified |
| Platform & deployment | ||
| Delivery model | hybrid Verified | software Verified |
| Web application | Yes Verified | — Could not read |
| Pricing & commercial terms | ||
| Price published | Partial Verified | Not published Verified |
| Pricing model | per-seat Verified | quote-only Verified |
| Entry price | 159 USD per user/month Verified | — Could not read |
| Currency | USD Verified | — Could not read |
| Project / design cap | 50 Verified | — Could not read |
| Seat cap | 1 Verified | — Could not read |
| Market fit & availability | ||
| Geographic availability | US; CA; EU Verified | DE; global Verified |
| Jurisdictional compliance capability | us-nec Verified | — Could not read |
| Residential | Yes Verified | No Verified |
| Target buyer | small-installer; sales-org Verified | enterprise-epc; engineering-firm Verified |
| Utility-scale | No Verified | Yes Verified |
Scroll the table sideways to see both products. The capability column stays in place.
Framed as requirements, not a verdict. Both descriptions come from the same data.
For residential installers and dealer/sales organisations who need design accuracy and a proposal in the same tool, on a per-seat subscription. Not for utility-scale or large C&I work — the vendor's own navigation routes "Commercial" to a different product (HelioScope), and the Aurora plan tables cap Basic/Premium at 1 user and 50 projects/month.
Full Aurora Solar profileFor utility-scale project developers, EPCs and engineering firms that already own a Civil 3D estate, have IT able to run and back up a SQL Server instance, and need a layout that survives into earthworks and pile-driving coordinates. Not for anyone who wants a browser tool, a price they can read, a trial they can self-serve, a rooftop or residential workflow, or a licence that survives losing a USB stick — the vendor's own help centre says losing the dongle "will result in the irrevocable loss of your license" and recommends buying electronics insurance.
Full HELIOS 3D profileMidsummer
Design & simulation · Web
SolarEdge Technologies
Design & simulation · Web
National Laboratory of the Rockies (NLR) — formerly the National Renewable Energy Laboratory (NREL)
Design & simulation · Desktop
They differ most on price published. In total we recorded 27 verified differences and 8 points where they are the same.
Aurora Solar is priced per-seat and HELIOS 3D is priced quote-only. These are different pricing models, so a single side-by-side figure would be misleading. Each is shown as its vendor states it.
We do not name a winner. Both are described from the same verified data, and which suits you depends on your requirements — the differences above are the facts; the choice is yours.
Last verified
Vendors change pricing and features without notice. Check the vendor’s own page before deciding.
This comparison is generated from the feature database, not written by hand. A pair is only published when the data holds at least five stateable differences — which is why 281 candidate pairs were refused. How comparisons are built